Our Key Projects and References
Provision of documentation and facilitators to conduct a Platform Decommissioning Workshop in Kuala Lumpur for Petronas, Carigali, Shell, ExxonMobil, CTOC, Unocal, CUEL, KNOC & others (Malaysia)
2004 - IBC Asia (S) Pte Ltd
Perform a Feasibility Study and Cost Estimate for the Removal,
Decommissioning and Disposal of all Marathon Oil UK Ltd assets (6 x Fixed Platforms - Brae, Hemidal, 5 x Subsea Pipelines - Brae, 9 x Subsea Completions - Brae, Sedwick, Kingfisher, Vale, Skirne-Byggve, Foinaven, 1 x FPSO - Foinaven and 2 x Onshore Gas plants - Kinsale, Sage) in the North Sea UK & Norwegian Sector (UK)
2005 - Marathon Oil UK Ltd
External Consultant / Guest Speaker for Petronas' Decommissioning Capability Ruler Workshop in Bukit Tinggi (Malaysia)
2005 - Petronas
External Consultant / Guest Speaker for Petronas and Shell's Decommissioning Workshop in Labuan (Malaysia)
2005 - Petronas
Perform a Feasibility Study and Cost Estimate for the Removal, Decommissioning and Disposal of all Carigali Hess assets (6 x Wellhead Platforms - Cakerawala - A, Cakerawala - B, Cakerawala - C, Bulan A, Bumi A & Suriya - A, 1 x Central Processing Platform - Cakerawala - P, 1 x Riser Platform - Cakerawala - R, Exploration Well Stubs, 1 x FSO, PLEM, 7 x Major Trunk lines) in Malaysia and MTJA (Malaysia - Thailand Joint Development Authority)
2006 - Carigali Hess Operating Company
Provision of 82 Personnel for Shell Exploration & Production's Provision of Manpower for Umbrella Contract (PMUC)
Nov 2007 - Jan 2012 - Shell Exploration & Production
Provision of 35 Personnel for Petronas Technical Services Sdn Bhd (PTSSB)
Dec 2011 - June 2017 - Petronas Technical Services Sdn Bhd (PTSSB)
Provision of 93 Personnel for Malaysia LNG Sdn Bhd's Umbrella Contract for Project Delivery Department (PDD)
July 2012 - Dec 2014 - Malaysia LNG Sdn Bhd
Supply of Synthetic Foam Buoyancy for Deepwater Project (Indian Ocean)
2014 - Dragon and Elephant Enterprise Taiwan
Supply of 28 units of Flexible Riser Distributed Buoyancy Modules @ 75 MWD for Nong Yao Field Development Project (Thailand)
2014 - Mubadala Petroleum & Omni Offshore Terminals JV / Technip
Supply of 16 units of Flexible Riser Distributed Buoyancy Modules @ 80 MWD for PFLNG-1 Kanowit Field Development Project (Malaysia)
2014 - Petronas Carigali / Technip
Supply of 3 sets of Subsea Rigid Pipeline Flange and Mechanical Connectors Insulation Covers @ 70 MWD for Bunga Orkid C Project (Malaysia)
2016 - Talisman / Sapura Kencana TL Offshore
Supply of 2 sets of Subsea Rigid Pipeline Flange Insulation Covers for F12 Field Development Project (Malaysia)
2016 - Petronas Carigali / MMHE (Malaysia Marine and Heavy Engineering)
Supply of 8 units of J-Tube Centralizer for Bardegg 2 - Baronia Field Development Project (Malaysia)
2016 - Petronas Carigali / Technip
Supply of 5 sets of Subsea Rigid Pipeline Flange Insulation Covers for Bunga Tulip Pipeline Replacement Project (Malaysia)
2016 - Talisman / Sapura Kencana TL Offshore
Supply of 75 sets of Uraduct for Bardegg 2 - Baronia Field Development Project (Malaysia)
2016 - Petronas Carigali / Technip
Supply of 20 units of Flexible Riser Distributed Buoyancy Modules @ 1500 MWD for Dalia Phase 2A Project (Angola)
2016 - Total Angola / Aker Solutions Malaysia
Supply of 1 unit of PFP Penetration Seal for Shwe Field Development (Myanmar)
2016 - Posco Daewoo / Technip
Perform a BPEOA (Best Practicable Environmental Option Assessment) as a PCPP DOA (Decommissioning Option Assessment) for D30 & Dana Topsides, Substructures, PLEM & Pipelines and D35 Riser & Equipment (Malaysia)
2016 - PCPP Operating Company (Petronas Carigali, Pertamina & PetroVietnam JV)
Supply of 23 sets of Subsea Rigid Pipeline Flange Insulation Covers for Bunga Kekwa C Field Development Project (Malaysia)
2017 - Repsol / Sapura Kencana TL Offshore
Supply of 1 set of Kevlar Straps and Tensioning Assemblies for F12 Project (Malaysia)
2017 - Petronas Carigali / Sapura Kencana TL Offshore
Supply of 17 units of Subsea Modular Buoys @ 300 MWD for B-127 Cluster Pipeline RTR Project (India)
2017 - ONGC (Oil and Natural Gas Corporation Limited) / Sapura Energy
Supply and Application of Thermal Insulation for 4x Subsea X'Mas Trees for Dalia Phase 2A Field Development in Port Klang (Angola)
2017 - Total Angola / Aker Solutions Malaysia
Supply of 42 units of Flexible Riser Distributed Buoyancy Modules @ 1300 MWD & 21 units of Bend Restrictors for Block H Field Development Project (Malaysia)
2018 - Murphy Oil (PTTEP) / TechnipFMC
Supply of 30 units of Flexible Riser Distributed Buoyancy Modules @ 1500 MWD for Dalia Phase 3A Project (Angola)
2018 - Total Angola / Aker Solutions Malaysia
Supply of 182 sets of Uraduct for Submarine Cable Protection System (Singapore)
2019 - Telekom Malaysia & Malaysia-Cambodia-Thailand Cable System (MCT) JV
Supply of 8 units of Trimsyn @ 2000 MWD for Kikeh Field Development Project (Malaysia)
2019 - PTTEP (Murphy Oil) / TechnipFMC
Supply of 9 units of Dynamic Subsea Cable Buoyancy Modules @ 70 MWD for MAMPU-1 FPSO Project (China / Malaysia)
2019 - MISC / Oriental Cable Network China
Supply of 10 units of Flexible Riser Distributed Buoyancy Modules @ 70 MWD for East Cendor Project (Malaysia)
2019 - Petrofac / TechnipFMC
Supply of 10 units of Flexible Riser Distributed Buoyancy Modules @ 70 MWD for TNAG (Tembikai Non-Associated Gas) Field Development Project (Malaysia)
2019 - Vestigo Petroleum / TechnipFMC
Supply of 6 sets of Uraduct for Bokor Field Development Project (Malaysia)
2019 - Petronas Carigali / TechnipFMC
Supply and Application of Thermal Insulation for 5x X'Mas Trees for Dalia Phase 3A Field Development (Angola)
2019 - Total Angola / Aker Solutions Malaysia
Supply of 8 sets of Shock Cells for North Malay Basin Phase 3 Field Development Project (Malaysia)
2020 - Hess / Sapura Energy